Diaphragm wall construction method×TRD工法協会 - List of Manufacturers, Suppliers, Companies and Products

Diaphragm wall construction method Product List

1~1 item / All 1 items

Displayed results

TRD method: uniform thickness soil-mixed ground continuous wall method

TRD method

This construction method connects a chainsaw-type cutter inserted into the ground to a base machine, allowing it to move laterally to excavate a trench, inject a solidifying liquid, and mix and stir with the in-situ soil, thereby creating a continuous soil-cement wall underground.

  • Ground foundation construction method
  • Other civil engineering services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration